WE HAVE MOVED TO: http://www.qcc.edu/campus-police

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Public Safety Home
Up

    

                      

 
CAMPUS POLICE - LOOP ROAD CONSTRUCTION SITE - UPDATES

 

Please scroll down for updates: (Be sure to refresh your browser)

SEPTEMBER 18,2009

The Loop Road will begin to be used Friday 9-17-09. The main Spine Road will be closed to all traffic. Please drive slowly and follow the flow of traffic around the Campus!

 

SEPTEMBER 3, 2009

The front of the Administration Building Parking Areas and the Main Driveway is currently OPEN! 

 
Public Safety will be on hand to help monitor and reacquaint everyone to the new lots etc. Please be patient when navigating the campus.
 
I do need your assistance:
bulletThe speed limit on campus is 10 MPH so please keep that in mind when driving around campus! 
bulletThe traffic patterns on campus has not changed. We will continue to use the main roadway and both service roads to Surprenant and the rear of Administration Building.
bulletAll parking lots are open which include the  Administration, Surprenant and all the Student lots.
bulletPlease drive slow around the area of the Public Safety Office as it is currently not paved. Also keep in mind there will be no parking lines and we ask that when parking to try to keep a reasonable amount of space between your car and one that is already parked in order to reduce fender benders (accidents). Also, if you park in as orderly a fashion as possible we should not lose too much of the limited parking space.
bulletAll campus signage is in effect to include Stop Signs and Pedestrian Yield Signs please obey them.
Keeping you safe!
 
Thanks.
Chief Kevin Ritacco 

 

 

AUGUST 5, 2009 - Do to paving, Lot 1 will be closed tomorrow, Wednesday, August 5th.   Lot 2 will be open for staff parking.

JULY 27,2009- The front entrance on West Boylston Street will be closed until August 10, 2009.

JULY 20, 2009-  The front entrance on West Boylston Street will be closed for the rest of this week. Watch this page for updates.

JULY 17,2009  -  Paving will start in front of the Administration Building and parts of the outer loop road around Surprenant, Athletic Center and Assumption Avenue. It is estimated to be completed by the beginning of next week weather permitting.Ju

 

JUNE 8 2009 -   If you have special needs, please contact the Public Safety Office. 

(Click for map)  June 8th, all parking spaces in front of the Administration Building will be closed for construction.  In addition, there will be work done on the south entrance area of Lot #1 from Assumption Avenue -- and so Assumption Avenue will be closed on a daily basis, re-opening everyday at 3:30 p.m. for emergency access only. 

These closures are expected to last for about a month.

(Click for map)  Parking Lot #1 will be dedicated for Faculty and Staff use during this time.

 

Finally, the connector between Lot #2 and Lot #3 will be closed at this time.  Entry to Lot #1 will be obtained through Lot #2, as usual. 

During this time all the front doors to the Administration Building will be locked. Please do not attempt to enter or exit the building through the construction area out front. You may exit through the front doors during an Emergency!

All of the back doors will be open as usual.

JUNE 1,2009 -

Beginning June 1st, the contractor will be taking over the front parking spots adjacent to the construction site where the new road is being sited.  That is, the spots that are at the edge of the front parking lot area near the new wall will no longer be available for parking. This area is  the front of the Administration Building.

May 4 2009 -

The Entrance to the Athletic Center will be changed as of this Monday, May 4th. To enter the Athletic Center please use the front entrance (street side).
 
The side entrance will be closed during the loop road construction. We will keep you updated if any other changes occur.

 

April 23,2009 -

Marland Street Exit behind the Surprenant Building will be closed. Parking is still available in the staff lots however the current one way portion of the service road will become two way. Signage and campus police officers will be in the area to assist you.

 

 